LAPORAN MESYUARAT/TAKLIMAT 24 OKTOBER 2008 JKR ELEKTRIK HQ.
Berikut adalah ringkasan catatan taklimat tersebut untuk tindakan pihak tuan:
1) Engineers should anticipate PROBLEM during DESIGN period... and brief site staff the anticipated problem during project construction.
2) Electrical engineers should do design coordination review with another consultants regularly to avoid problem or mis-coordination.
3) Identify main service route since beginning and visualize the traffic and do coordination drawing.
4) Make sure all installations is maintanable and serviceable in future.
5) Check whatever site staff do and verified.
6) Design drawing and shop drawing must be on site. These drawings must be endorsed by relevant party.
7) Coordinated services drawing must be prepared prior installation and discussed among services.
8) Make sure all installation follows QA process of either JKR or QAS contractor.
9) Endorsed method statement must be on site for detailing services involved.
10) Mock up is needed to establish some standard in any installation. Verify the mock up.
11) RE or COW must be appointed now. JKR in scheduling to conduct a seminar to all REs and COWs for this project.
12) Any installation that considered special, please prepare the drawing specifically.
13) Trunking shall be installed using proper support.
Material for this presentation can be seen below:
Thank you....
Ir Muhammad Arkam
31 October 2008.
1) Engineers should anticipate PROBLEM during DESIGN period... and brief site staff the anticipated problem during project construction.
2) Electrical engineers should do design coordination review with another consultants regularly to avoid problem or mis-coordination.
3) Identify main service route since beginning and visualize the traffic and do coordination drawing.
4) Make sure all installations is maintanable and serviceable in future.
5) Check whatever site staff do and verified.
6) Design drawing and shop drawing must be on site. These drawings must be endorsed by relevant party.
7) Coordinated services drawing must be prepared prior installation and discussed among services.
8) Make sure all installation follows QA process of either JKR or QAS contractor.
9) Endorsed method statement must be on site for detailing services involved.
10) Mock up is needed to establish some standard in any installation. Verify the mock up.
11) RE or COW must be appointed now. JKR in scheduling to conduct a seminar to all REs and COWs for this project.
12) Any installation that considered special, please prepare the drawing specifically.
13) Trunking shall be installed using proper support.
Material for this presentation can be seen below:
Thank you....
Ir Muhammad Arkam
31 October 2008.
Kit Selia Elektrik Versi 2
View SlideShare presentation or Upload your own.
Melamine-For info....
Lawatan Tapak Unik Elektrik CKBA 29 Oktober 2008
Kepada mereka yang terlibat sila rujuk gambar di bawah untuk laporan sesi lawatan unit Elektrik CKBA ke tapak bina pada 28 Oktober 2008.
Wednesday, October 22, 2008
Lawatan JKR Elektrik 22 Oktober 2008
Lawatan JKR Elektrik telah dibuat pada 22 Oktober 2008 dan gambar aktiviti boleh di lihat di bawah:
Terima kasih...!
Terima kasih...!
Tuesday, October 21, 2008
Monday, October 20, 2008
Thursday, October 16, 2008
ADTEC 17 October 2008
Berikut adalah gambar dan video ADTEC pada 17 Oktober 2008 sekitar bengkel, asrama, dan kuarters. Zon lain akan diupload kemudian. Sekian, terima kasih.
Wednesday, October 15, 2008
UiTM Lecture Schedule
Dear students,
Please be informed that our lectures schedule are as follows:
Friday (17 October 2008) :
Lecture BKA 3.15 2000Hrs-1200Hrs
Saturday (18 October 2008):
Test 1 BKA 3.15 0900Hrs-1100Hrs
Lecture BKA 3.15 1100Hrs-1300Hrs
Monday (20 October 2008) :
Lecture Bilik Multimedia 2 2000Hrs-22Hrs
Tuesday (21 October 2008) :
Lecture Bilik Multimedia 2 2000Hrs-2200Hrs
Friday (24 October 2008) :
Test 2 BKA 3.15 2000Hrs-22Hrs
Thank You.
-Ir Muhammad Arkam
Tuesday, October 14, 2008
USM Lecture Materials.
Dear friends,
Dr Mohd Rodzi's lecture materials can be downloaded HERE or scroll down to bottom-right-hand-corner and click USM'S LECTURE MATERIALS icon for reference.
Thank you...
Monday, October 13, 2008
Lawatan JKR CKBA HQ 9 Oktober 2008
Lawatan tapak oleh Datin Azizah, Pengarah CKBA JKR HQ telah dibuat pada 9 Oktober 2008 dan gambar-gambar seperti berikut:
Wednesday, October 8, 2008
ADTEC 8 OKTOBER 2008
Disertakan video dan photo ADTEC pada 8 Oktober 2008 untuk tontonan pihak yang terlibat. Ini adalah gambar pertama selepas cuti panjang Aidilfitri.
Sekian, terima kasih.
Salam Aidilfitri
Saya ingin mengucapkan SALAM AIDILFITRI kepada semua pembaca dan pengunjung blog ini semoga ibadat kita tahun ini diterima Allah dan dilanjutkan lagi usia kita dalam kebaikan untuk menerima Ramadhan yang akan datang...
Salam Aidilfitri.
Salam Aidilfitri.
Subscribe to:
Posts (Atom)